PROJECTS

Projects completed under the direct management of Jim Perry:

Horizontal Directional Drilling

CLIENTPROJECTDETAILS
TelstraTelstra Cable TV Rollout, SydneyInstalled tens of thousands of metres of conduit utilising HDD
OptusOptus Cable TV Rollout, SydneyInstalled tens of thousands of metres of conduit utilising HDD
Optus NetworksSouthern Cross Cable Network Clovelly Shore LandingsHDD Shore Landings1 x 1105m x 125mm diameter1 x 1032m x 125mm diameter
Level 3 CommunicationLevel 3 Communication1 x 250m x 125mm HDD
GTE Hawaiin TelSouthern Cross Cable Network Oahu, Hawaii Ocean Bores4 off 125mm conduits installed in environmentally sensitive coral.1 x 1,000m1 x 858m1 x 807m1 x 808m
OMV AustraliaPatricia Baleen HDD Shore Approach (Forward Thrust)2 x 850m x 300mm forward thrust shore landings
Northside Storage Tunnel AllianceNorthside Storage Tunnel Shelly Beach630m of 457mm Shelly Beach inclined tunnel intersection bore in Hawkesbury Sandstone
Chinese PetroleumRiver Park Gas Pipeline Project850m x 406mm River Park Bore R03A-R03
Sydney WaterDee Why Inclined bore to Narrabeen Sewerage Tunnel160m x 300mm Dee Why inclined tunnel intersection bore in Hawkesbury Sandstone
Indian Oil CompanyIndia Pipeline1400m x 300mm India River 2
Formosa Petrochemical CorpLong Der Industry Area HDD1080m x 300mm Long Der Bore 11080m x 300mm Long Der Bore 2
Alcatel Submarine Networks Pty LtdI2I Cable Network Cable Shore Approach300m x 175mm 121 Ocean Bore
Network Design & ConstructionAustralia-Japan Cable Landing -Tamarama Park, Sydney1 x 1,000m x 400mm HDD Tamarama Landward Bore
Network Design & ConstructionAustralia-Japan Cable Landing Shore Approach – Tamarama Park2 x 1023m x 250mm Tamarama Ocean Bore A & B

Global Marine Submarine CablesAPCN-2 Singapore Shore Approach350m x 160mm APCN2 Ocean Bore
C2CC2C Cable Network Singapore Shore Approach330m x 160mm C2C Ocean Bore
Duke Energy InternationalEastern Gas Pipeline865m x 457mm Cataract River Gorge
Duke Energy InternationalEastern Gas Pipeline695m x 457mm Shoalhaven River
Duke Energy InternationalEastern Gas Pipeline600m x 457mm Illawarra Escarpment
Duke Energy InternationalEastern Gas Pipeline493m x 457mm Ousedale Creek
Duke Energy InternationalEastern Gas Pipeline448m x 457mm Hume Highway
Duke Energy InternationalEastern Gas Pipeline351m x 457mm Tianjara River

Microtunnelling

CLIENTPROJECTSDETAILS
Logan Water AllianceAlfred Street Pump Station Pipeline2 x 180m x 1500mm ID bores, shafts and installation of a 1200mm MSCL pressure pipeline under the M1 Motorway and the Logan Motorway
Queensland Urban UtilitiesBundamba Stage 1a Trunk Sewer480m x 860mm laser guided microtunnelled steel encasing pipe, insertion of DN800 HDPE gravity sewer at 0.2% grade. Construction of 18 manholes and 700m of DN800 pipe using open cut techniques.
Queensland Urban UtilitiesBundamba Stage 1b Trunk Sewer960m x DN1400 GRP gravity sewer pipe including pipe jacking. Construction of 20 manholes up to 4.1m diameter with multiple live cutovers.
Civdec P/LNorth Shore Infrastructure, Hamilton540m x 860mm gravity sewers using laser guided slurry microtunnelling at 0.2% grade.
SEQ WaterSEQWater Northern PipelineMultiple 860mm bores in rock for water pipeline
Safelink AllianceIpswich Motorway Upgrade470m x 860mm steel for gravity sewers
Civil Contractors P/LNorth Lakes Sewer System84m x 860mm steel for gravity sewer
McDonald Keen P/LAquagen 2 Water Pipeline70m x 860mm bore for water pipeline
Coffs Harbour City CouncilArrawarra Sewer System180m x 860mm steel for gravity sewer creek crossing
Gold Coast Desalination AllianceGold Coast Desalination6 Shafts up to 15m deep
1 x 228m x 1500mm microtunnel under Currumbin Creek
1 x 174m x 1500mm microtunnel
1 x 139m x 1500mm microtunnel
Eastern Pipeline AllianceEastern Pipeline AllianceMultiple shafts up to 15m deep in OTR and rock
Western Pipeline AllianceWestern Pipeline Alliance2 Shafts 27m and 29m deep in rock
1 x 185m x 1500mm microtunnel in rock under the Bremer River, Ipswich
FRH ConstructionsCampaspe River Crossing1 x 135m x 1500mm microtunnel in soft formation
Setlow Pty Ltd for Gold Coast City CouncilNorth Oakey Creek, Coomera125m of 750mm steel casing Microtunneling
Diona Pty LtdWyong Water Supply Stage 355m + 25m of 1000mm, 53m of 900mm Auger Boring, 65m of 1000mm microtunneling
Tenix Alliance for Gold Coast City CouncilBeenleigh Water Scheme715m of 600mm steel casing Microtunneling
John HollandMerrimac WWTP Waterfuture Alliance56m of 400mm steel casing
Tenix Alliance for Gold Coast City CouncilBeenleigh Water Scheme900m of 700 VC Jacking pipe Microtunneling (6 Bores)
AbigroupAlbury50m of 2100 Pipe Jacking
Coe Drilling Australia for Sydney WaterWarragamba Dam218m of 450mm steel casing Microtunneling
Tenix Alliance for Gold Coast City CouncilTenix Coomera M1 Bore190m of 750mm steel casing Microtunneling
McConnell DowellMcConnell Line H28m of 750mm steel casing Microtunneling
Coops Drainage & CivilCoops Pimpama M1 Bore108m of 457mm steel casing
Tenix Alliance for Gold Coast City CouncilBeenleigh Water Scheme62m of 1070 steel casing pipe jacking
Tenix Alliance for Gold Coast City CouncilBeenleigh Water Scheme179m of 750mm steel casing microtunneling
Tenix Alliance for Gold Coast City CouncilBeenleigh Water Scheme730m of 400mm – Microtunneling (7 bores)

Auger Boring

CLIENTPROJECTDETAILS
McConnell DowellBraemar Linepack Pipeline Dalby24m + 36m of 525mm RC pipe Auger Boring
Diona Pty LtdWyong Water Supply Stage 355m + 25m of 1000mm, 53m of 900mm Auger Boring, 65m of 1000mm microtunneling
Brisbane City CouncilRonald Street Wynnum30m of 419mm steel casing Augerboring
Hall ContractingPelican Waters20m of 800mm steel casing Auger Boring
Stephen Todd ContractorsWahroonga2 x 70m of 400mm steel casing Auger Boring
Q CivilHarvey Bay36m x 600mm steel pipe Auger Boring
Shepherds ContractingHarvey Bay3x25m of 600mm + 3x25m of 750mm steel pipe Auger Boring
United KGKawana Sewerage Plant10m of 1000mm Hobas pipe – Auger Boring
Meindale GroupRiverwood Estate Murramba Downs122m of 350mm – Auger Boring
JFM Contracting for Gold Coast City CouncilBrisbane Road, Labrador42m of 600mm – Auger Boring
Redcliffe City CouncilRedcliffe48m of 900mm steel casing – Auger Boring
Concord ContractingRedbank Plains31m of 323mm steel casing – Auger Boring
Brisbane City CouncilGaythorne17m of 450mm steel casing – Auger Boring
Seymor WhiteNerang – Beaudesert Rd, Nerang, QLD3 x 10m of 750mm steel casing – Auger Boring
Lihir Management CompanyLihir Island, PNG27m of 750mm steel casing – Auger Boring
F&M PlumbingIkinja Road, Alexandra Headlands, QLD44m of 650mm + 15m of 650mm steel casing – Auger Boring
Kennedy Contracting for Delfin Lend LeaseOppossum Creek Sewer, Springfield Lakes, QLD111m of 600mm + 70m of 300mm + 75.5m of 300mm steel casing – Auger Boring
Maroochy Shire CouncilTainton Rd. Woombye, QLD44m of 600mm (0.2% grade) steel casing – Auger Boring
Donnelly Mining & CivilNarromine STP, NSW30m of 323mm + 40m of 406mm steel casing – Auger Boring

Pipe Jacking

CLIENTPROJECTDETAILS
Liverpool City CouncilLiverpool CBD Trunk Drainage Upgrade78m of 2100 RC Pipe Jacking
Tenix Alliance for Gold Coast City CouncilBeenleigh Water Scheme62m of 1070 steel casing pipe jacking
Thiess John Holland JVLane Cove Tunnell20m of 1200mm RC – Pipe Jacking
Demac ExcavationsM1 Robina102m of 1000mm pipe jacking and 45m steel pipe trenched
McConnell DowellHeroes Avenue Brisbane4m + 9.5m + 27.5m of 1200 RC pipe – Pipe Jacking
Thiess John Holland JVLane Cove Tunnell30m of 1200mm RC – Pipe Jacking
QMC Group for Brisbane City CouncilWesterham St, Taringa50m of 1200mm RC pipe – Pipe Jacking
Power Water NTPower & Water NT Darwin160m of 2100mm ID RC pipe jacking + 15m of 1400×2360 box culvert open excavation
Denari Earthmoving for Brisbane City CouncilJolimont St, Sherwood62.5 of 1000mm RC pipe – Pipe Jacking
Coops Drainage & CivilCoombabah24m of 1000mm steel casing – Pipe Jacking
Thiess Hochtieff PRL JVThiess Hochtieff JV Chatswood22m of 900mm – Rehabilitation of ribloc pipe
Brisbane City CouncilKitchener Street, Sherwood, QLD38m of 1.4m RC – Pipe Jacking & associated drainage works
SF for Brisbane City CouncilDoomben Racecourse151m of 2400mm concrete – Pipe Jacking

Tunnel Support Canopies

CLIENTPROJECTDETAILS
BMD ConstructionsWICET Coal Conveyor TunnelInstallation of 1,090m x 450mm canopy tube support bores and box jacking of 52m x 7.8m wide x 4.8m high box culvert
Transcity JVTranscity Tunnel, BrisbaneInstallation of 400m x 900mm twin arched canopy tube structures at the TBM entry point to support the ground above launch.
Thiess John HollandAirport Link2,547m x 762mm canopy tube structure to support 7 live rail lines.

Box Culvert Jacking

CLIENTPROJECTDETAILS
BMD ConstructionsWICET Coal Conveyor TunnelInstallation of 1,090m x 450mm canopy tube support bores and box jacking of 52m x 7.8m wide x 4.8m high box culvert
Thiess John HollandAirport Link2,547m x 762mm canopy tube structure to support 7 live rail lines.
Seymour Whyte Const.Normanby Cycleway38m x 4.8m x 3.6m box culvert for pedestrian cycleway in rock
Thiess John Holland JVLane Cove Tunnel38m x 4.8m x 3.6m box culvert for pedestrian cycleway in rock
Abergeldie Civil Infrastructure for the Lane Cove Tunnel Project, Thiess John Holland JVReserve Road Cycle underpass, Artarmon30m of 4.6m x 3.3m – Box Culvert Jacking in mixed ground and Hawkesbury Sandstone